All projects
5 shown · arrow keys move between projects.
Tidewater
Scheduling for marine service yards
Boat yards were booking haul-outs on whiteboards and losing a day a week to double bookings.
- Double bookings
- down 80%
- Yards using it
- 41
- Median page load
- 0.9 s on 3G
Ledgerline
Invoice reconciliation service
Finance teams were matching payments to invoices by hand after a nightly batch missed ambiguous records.
- Invoices a month
- 2.1 million
- p95 match time
- under 300 ms
- Manual review
- 34% to 6%
Fieldnotes
Offline-first inspection app
Inspectors worked without reliable signal and re-entered notes when they returned to the office.
- Report turnaround
- 5 days to same day
- Human sync review
- under 1%
Palmetto
A migration linter for Postgres
A safe-looking schema change locked a production table during checkout traffic.
- Repository stars
- 1,400
- Contributors
- 23
- CI installations
- 60+ companies
Greenroom
Design system and component library
Six product teams had six visual languages and different keyboard behavior for the same controls.
- Components
- 48
- Product teams
- 6
- UI defects
- down 37%